'With construction almost eleven months ahead of schedule, there’s the possibility that the extension will begin fare service by the end of 2013'
(via Building Transit Today: The #7 Line Extension)
Posted with Percolate

'With construction almost eleven months ahead of schedule, there’s the possibility that the extension will begin fare service by the end of 2013'

(via Building Transit Today: The #7 Line Extension)

Posted with Percolate

  1. drinkordiealtona reblogged this from jamesgross
  2. xxreiofsunshinexx reblogged this from jamesgross
  3. ooooaaaaooooooo reblogged this from jamesgross
  4. keyonasymone reblogged this from jamesgross
  5. triggercell reblogged this from jamesgross
  6. roastofdickchan reblogged this from jamesgross
  7. solaceinthesilence reblogged this from jamesgross
  8. bifocle reblogged this from totography
  9. thecoastexplodes reblogged this from jamesgross
  10. rantspace464 reblogged this from jamesgross
  11. dovahkiincreed reblogged this from jamesgross
  12. hntryoung reblogged this from jamesgross
  13. twoticketstoparadise reblogged this from trendytraveler
  14. contemplativeconfessions reblogged this from jamesgross and added:
    Going to the unknown
  15. mollybelle reblogged this from jamesgross
  16. slp10 reblogged this from jamesgross
  17. acanuck-eh reblogged this from jamesgross
  18. enigmaticillusion reblogged this from jamesgross
  19. finalapostle reblogged this from aynse
  20. aynse reblogged this from jamesgross
  21. dianbui reblogged this from jamesgross
  22. theydonotmove reblogged this from jamesgross
  23. jamesgross posted this